Register for OCSBBS.COM - your resource for the Gulf of Mexico Oil Industry
Login to OCSBBS
Contact OCSBBS
 
    Thursday, March 11 2010
Username
Password
Remember this login information
Need help logging in?

Member Data Available To Registered Clients
The following data is available once you register with OCS BBS.
Lease Info
  • Lease Info
  • Lease Polygons
  • Lease Production
  • Lease Owners
  • Lease Owner History
  • Lease Operating Rights
  • Company Info
  • Company Merger, Acquisition & Affiliations
  • Company News Articles
  • Company Qual Card
  • Company Operating Rights
  • Company Net Lease Production
  • Company Platform Info
  • Company Pending Assignments
  • Company Well Info

  • Offshore Block Info
  • Block Polygons
  • Area/Block Production
  • Multi-Block Activity

  • Field Info
  • Field Info by Lease, Owners & Operators

  • Pipeline Info
  • Pipeline Info

  • Platform Info
  • Platform Info

  • Production Info
  • Block, Lease & Well Production

  • Prospect Info
  • Prospect Names, Blocks, & Owners

  • Well Info
  • Well Info
  • Well Completion
  • Releasable Well Logs
  • Well Directional Surveys
  • Well Production
  • Well Tests

  • Lease Documents
  • Lease File Documents

  • Scanned Images
  • Non-Required Filings
  • Unit Agreement Images
  • Well File Documents
  • G & G Scanned Permits

  • Other Data Available
  • Applications To Drill
  • Bid History
  • Documents Database
  • Pending Assignments
  • Recently Approv. Ass.
  • Paleontology Information
  • Plans of Expl. (POE's)
  • Weekly Activity Fax
  • Regional Reports
  • OOSA Rig Reports
  • Velocity Surveys
  • Discussion Forum

  • OCS BBS Web Mail:
    http://mail.ocsbbs.com OCS BBS Web Mail
    Liskow Lewis

    back Back to Safety Alerts

    U.S. Department of the Interior
    Minerals Management Service
    Gulf of Mexico OCS Region


    Safety Alert No. 229
    4 April 2005

    Contact: Glenn Woltman
     (504) 736-2438

    Inadequate Job Planning Results in Atmospheric Release of Gas  

    Failure to isolate the energy source during platform maintenance work allowed gas to migrate from the sales pipeline back through production equipment resulting in the total evacuation of gas to the atmosphere from a 30-inch pipeline.  The incident occurred after pipeline personnel had closed their sales and riser valves at the platform and bled the system down for valve maintenance work.  Later during the day, production personnel decided to re-pressure the platform system to move condensate built up in the vessels down the pipeline.  As the system pressure was increasing, valves off the condensate coalescer began to leak.  Gas started blowing back through the dump line and out the flare boom while personnel began removing the leaking valves.  Personnel were ordered to evacuate.  Gas continued to migrate from the sales pipeline back through the production train, eventually escaping through the open-ended piping at the coalescer over the next 32 hours until such time as the pipeline had essentially been bled off.  At that time, pipeline personnel were able to board the platform and close the manual sales valve, effectively isolating the energy source.        

    MMS concluded that (1) failure to develop a detailed written procedure (JSA) for the work to be performed prevented personnel from identifying and properly isolating the energy source, and (2)   the lack of communications between pipeline and production personnel, coupled with the failure to utilize the company’s stop work authority policy, allowed critical warning signs leading up to the incident to be overlooked, and (3) failure to use lock-out/tag-out procedures to properly isolate the production equipment and process piping indirectly resulted in the mishap.  

    The MMS recommends the following:

    ·         Supervisors must provide adequate job instructions and planning prior to the work. 
    ·         Hazards must be identified as work proceeds, and a “stop work policy” in place as the job scope changes. 
    ·         Personnel must be familiar with and utilize lock-out and tag-out procedures to isolate equipment and process piping during work programs. 
    ·         Simultaneous operations must be clearly communicated to all appropriate parties, detailing all site-specific procedures prior to work being implemented.

    An investigation of this incident has been conducted, and the report is available on the MMS website:  

    http://www.gomr.mms.gov/homepg/offshore/safety/acc_repo/districtreports.html

    Featured Sponsor
    Waring Consulting

    OCSBBS Advertise Here

    Featured Event
    Feature Your Event Here