Register for OCSBBS.COM - your resource for the Gulf of Mexico Oil Industry
Login to OCSBBS
Contact OCSBBS
 
    Thursday, September 2 2010
Username
Password
Remember this login information
Need help logging in?

Member Data Available To Registered Clients
The following data is available once you register with OCS BBS.
Lease Info
  • Lease Info
  • Lease Polygons
  • Lease Production
  • Lease Owners
  • Lease Owner History
  • Lease Operating Rights
  • Company Info
  • Company Merger, Acquisition & Affiliations
  • Company News Articles
  • Company Qual Card
  • Company Operating Rights
  • Company Net Lease Production
  • Company Platform Info
  • Company Pending Assignments
  • Company Well Info

  • Offshore Block Info
  • Block Polygons
  • Area/Block Production
  • Multi-Block Activity

  • Field Info
  • Field Info by Lease, Owners & Operators

  • Pipeline Info
  • Pipeline Info

  • Platform Info
  • Platform Info

  • Production Info
  • Block, Lease & Well Production

  • Prospect Info
  • Prospect Names, Blocks, & Owners

  • Well Info
  • Well Info
  • Well Completion
  • Releasable Well Logs
  • Well Directional Surveys
  • Well Production
  • Well Tests

  • Lease Documents
  • Lease File Documents

  • Scanned Images
  • Non-Required Filings
  • Unit Agreement Images
  • Well File Documents
  • G & G Scanned Permits

  • Other Data Available
  • Applications To Drill
  • Bid History
  • Documents Database
  • Pending Assignments
  • Recently Approv. Ass.
  • Paleontology Information
  • Plans of Expl. (POE's)
  • Weekly Activity Fax
  • Regional Reports
  • OOSA Rig Reports
  • Velocity Surveys
  • Discussion Forum

  • OCS BBS Web Mail:
    http://mail.ocsbbs.com OCS BBS Web Mail
    Liskow Lewis

    back Back to Safety Alerts

    U.S. Department of the Interior
    Minerals Management Service
    Gulf of Mexico OCS Region

    Safety Alert No. 216
     October 22, 2003

    Contact: Jack Williamsl
     (504) 736-3012

    LOSS OF WELL CONTROL:  ANNULAR FLOW AFTER CEMENTING

    Recently, a drilling rig had completed cementing surface casing.  Shortly after the surface/conductor casing annulus was washed, the annulus began flowing.  Rather than release the flow into the diverter system, the crew attempted use the diverter to hold pressure to allow time for the cement to heal.  To hold pressure, the diverter was placed into the “test” mode, which allowed both the diverter packer element and vent-line valves to be closed simultaneously and immediately.

    The diverter in use featured a telescopic riser with seals bracketing the vent-line housing.  When the diverter was closed, the pressure rapidly increased until seals began leaking, forcing abandonment of the rig floor.  It was then discovered that the “test” mode disabled the ability to control the diverter system from the remote location.  The seal pressure could not be increased to contain the surface leak; the diverter valves could not be opened to relieve the pressure.  With gas on the rig and pressure rising on the untested conductor casing shoe, the rig and adjacent platform were evacuated.

    Several factors contributed to the potential severity of the event, including an erroneous chain of decisions, inadequate training of personnel or knowledge of the diverter system, and inadequate planning.    For a full report, see MMS panel report 2003-068. 

    MMS Safety Alert No. 165, issued in April 1995 identified 20 diverter incidents in the Gulf of Mexico from 1973 to 1995 related to well kicks after cementing surface casing.  Another 13 similar incidents have occurred since 1995, with the most serious consequences being broaching the surface, cratering, well loss, and rig and platform destruction by fire.  Annular flow related to cementing surface casing has been identified as one of the most frequent causes of loss of control incidents in the Gulf of Mexico.

    The MMS recommends to the operators and drilling contractors the following:

    1.  For each well, the operators and contractors should conduct a review of the contingency procedures to be followed in the event of annular flow after cementing.  Before using the diverter to hold back pressure after cementing, detailed planning is recommended, including identification of maximum pressure to be held, method of monitoring and measuring pressure, and how that pressure will be diverted if necessary. 

    2.  The operators and contractors should ensure the contingency procedures are clearly disseminated to all rig supervisors and any personnel who could be involved in emergency decisionmaking.

    3.  The operators and drilling contractors should ensure all supervisory personnel are fully trained in diverter operations specific to each rig, including pressure limits and control mechanisms, under all circumstances.

    4.  The operators should review cementing practices and procedures for shallow casing strings and adopt best cementing practices that provide the most protection from annular flow after cementing

    Featured Sponsor
    Venice Port Complex

    Drillsite Broadcasting

    Featured Event
    CleanGulf2010

    OC2010

    Feature Your Event Here


     
    http://www.ocsbbs.com/