Wednesday, March 10 2010
Member Data Available To Registered Clients
The following data is
available once you register with OCS BBS.
Lease Info
Lease Info
Lease Polygons
Lease Production
Lease Owners
Lease Owner History
Lease Operating Rights
Company Info
Company Merger, Acquisition & Affiliations
Company News Articles
Company Qual Card
Company Operating Rights
Company Net Lease Production
Company Platform Info
Company Pending Assignments
Company Well Info
Offshore Block Info
Block Polygons
Area/Block Production
Multi-Block Activity
Field Info
Field Info by Lease, Owners & Operators
Pipeline Info
Pipeline Info
Platform Info
Platform Info
Production Info
Block, Lease & Well Production
Prospect Info
Prospect Names, Blocks, & Owners
Well Info
Well Info
Well Completion
Releasable Well Logs
Well Directional Surveys
Well Production
Well Tests
Lease Documents
Lease File Documents
Scanned Images
Non-Required Filings
Unit Agreement Images
Well File Documents
G & G Scanned Permits
Other Data Available
Applications To Drill
Bid History
Documents Database
Pending Assignments
Recently Approv. Ass.
Paleontology Information
Plans of Expl. (POE's)
Weekly Activity Fax
Regional Reports
OOSA Rig Reports
Velocity Surveys
Discussion Forum
OCS BBS Web Mail:
http://mail.ocsbbs.com
|
|
|
Back to Safety Alerts
|
|
U.S. Department of the Interior
Minerals Management Service
Gulf of Mexico OCS Region |
Safety Alert No. 214
July 15, 2003 |
Contact: Jack Williams
(504) 731-3012 |
Flash Fire and Explosion from Inadequately Vented Production Vessel
A work crew initiated a confined space entry into a low-pressure
separator to sample undisturbed sand and sludge behind the weir. While the sample
was being retrieved, a flash explosion ignited in the vessel, exiting the open hatch.
The explosion injured four workers, one of whom was blown off the platform.
An MMS investigation produced panel Report MMS 2003-046, available at http://www.gomr.mms.gov/homepg/offshore/safety/acc_repo/accindex.html
The explosion was caused by the failure to open both hatches,
ventilate, and continuously ventilate the vessel during entry, despite extensive pre-job
procedural reviews. In addition, a gas detector was not deployed throughout the
entire area of entry. These procedural failures occurred in part because of no
managerial double-check of the actual operation. The injuries were caused by the
explosions impact on personnel inside the vessel and immediately outside the open
hatch. One man struck the guardrail cyclone fence material, springing it loose from
its frame, before falling into the water. No flotation aids were thrown to him.
The MMS recommends to Operators the following actions:
| |
The operators should emphasize proper confined space entry procedure in
the pre-job safety meetings and have a second party confirm the procedures are being
followed;
|
| |
Personnel not involved in a particular confined space entry should be
made aware of the potential danger areas immediately outside any open hatchway of a
vessel;
|
| |
Work crews should be reminded in safety meetings of the location of
emergency flotation devices and the need to access them first in a man-overboard
situation;
|
| |
Operators should review guard barrier ability to contain standard
impacts, especially in the vicinity of major production equipment, vessels, and work
areas.
|
|
|
|
|
|