The listing below contains the NTL's that have been issued to date.
NTL Number | Effective Date | Title |
|
2010-N06 FAQ's |
June 26, 2010 |
Frequently Asked Questions Information Sheet for NTL 2010-N06 |
|
2010-N06 |
June 18, 2010 |
Information Requirements for Exploration Plans, Development and
Production Plans, and Development Operations Coordination Documents on
the OCS |
2010-N05 FAQ's
(revised July 9)
2010-N05 FAQ's
(June 26) |
July 9, 2010 |
Frequently Asked Questions Information Sheet for NTL 2010-N05 |
|
2010-N05 |
June 8, 2010 |
Increased Safety Measures for Energy Development on the OCS |
|
2010-N04 |
May 30, 2010 |
To Implement the Directive to Impose a Moratorium on all Drilling of
Deepwater Wells |
|
2010-N03 |
March 25, 2010 |
Guidelines for Royalty Relief Under 30 CFR Part 203 |
|
2010-G03 |
February 11, 2010 |
Wells (holes-in-the-ground) Without Assigned MMS API Numbers |
|
2010-N02 |
February 28, 2010 |
The MMS 2010 National Safety Awards for Excellence (SAFE) at OTC |
|
2010-G02 |
March 3, 2010 |
Well Records Submittal |
|
2010-G01 |
February 1, 2010 |
Clarification of
Deep Gas Royalty Relief Regulation |
|
2009-G40 |
January 27, 2010 |
Deepwater Benthic Communities |
|
2009-G39 |
January 27, 2010 |
Biologically-Sensitive Underwater
Features and Areas |
|
2009-G38 |
December 1, 2009 |
Drilling Windows,
Eastern Gulf of Mexico |
|
2009-G37 |
November 20, 2009 |
Damage from
Hurricanes Gustav and Ike (Supplement No. 2) |
|
2009-G36 |
January 1, 2010 |
Using Alternate
Compliance in Safety Systems for Subsea Production Operations |
|
2009-G35 |
December 1, 2009 |
Sub-Seabed Disposal and Offshore
Storage of Solid Wastes |
|
2009-G34 |
December 1, 2009 |
Ancillary Activities |
|
2009-G33 |
November 4, 2009 |
Well Naming and Numbering Standards |
|
2009-G32 |
November 4, 2009 |
In-Service Inspection Intervals for
Fixed Platforms |
|
2009-G31 |
Oct 21, 2009 |
Hydrogen Sulfide |
|
2009-G30 |
Sept 1, 2009 |
Post-Hurricane Inspection and Reporting |
|
2009-G29 |
Oct 13, 2009 |
Implementation Plan for Transition from North American Datum 27 to
North American Datum 83 |
|
2009-G28 |
Oct 13, 2009 |
Alternate Compliance and Departure Requests in Pipeline Applications |
|
2009-G27 |
Sept 9, 2009 |
Submitting Exploration Plans and Development Operations Coordination
Documents |
|
2009-G26 |
Sept 9, 2009 |
U. S. Air Force Communication Towers |
|
2009-G25 |
Aug 25, 2009 |
Shutting In Producible Wells During Rig Moves |
|
2009-G24 |
Aug 14, 2009 |
Supervisory Control and Data Acquisition Systems |
|
2009-G23 |
Aug 14, 2009 |
Structure Assessment Before Moving a Platform Rig |
|
2009-G22 |
Aug 3, 2009 |
Casing Pressure |
|
2009-G21 |
Aug 7, 2009 |
Standard Conditions of Approval for Well Activities |
|
2009-G20 |
Aug 6, 2009 |
Standard Reporting Period for the Well Activity Report |
2009-G19 |
Aug 5, 2009 |
Containment for Bolted or Welded Storage Tanks |
2009-G18 |
Sept 9, 2009 |
Production Safety Systems |
2009-G17 |
Aug 4, 2009 |
Designated Safe Welding Areas on Rigs |
2009-G15 |
July 10, 2009 |
Digital Pipeline Location Data |
2009-G16 |
June 25, 2009 |
Global Positioning Systems for Mobile Offshore Drilling Units |
2009-N01 |
June 22, 2009 |
Applications for Renewable Energy Leases and Grants and Alternate
Use Grants on the U.S. Outer Continental Shelf |
2009-G12 |
June 1, 2009 |
Hurricane and Tropical Storm Effects Reports |
2009-G11 |
June 1, 2009 |
Accidental Disconnect of Marine Drilling Risers |
2009-G10 |
June 1, 2009 |
Guidelines for Jack-up Drilling Rig Fitness Requirements for
Hurricane Season |
2009-G14 |
May 21, 2009 |
Functional Responsibility of MMS Regulations |
2009-G13 |
20-May-09 |
Guidelines for Tie-downs on OCS Production Platforms for Upcoming
Hurricane Seasons |
2009-N03 |
May 12, 2009 |
Posting the Department of the Interior (DOI) Inspector General's
Hotline number at Outer Continental Shelf (OCS) Oil and Gas Facilities |
2009-G07 |
May 1, 2009 |
Location of Choke and Kill Lines on Blowout Preventer Stacks |
2009-G05 |
April 27, 2009 |
Approval of Acidizing Operations |
2009-G06 |
April 22, 2009 |
Military Warning and Water Test Areas |
2009-N02 |
Feb 10, 2009 |
Timely Submission of Suspension Requests |
2009-G04 |
Jan 27, 2009 |
Significant OCS Sediment Resources in the Gulf of Mexico |
2009-G03 |
Jan 27, 2009 |
Synthetic Mooring Systems |
2009-G02 |
Jan 27, 2009 |
Ocean Current Monitoring |
2009-N01 |
Jan 8, 2009 |
Workshop on Subpart O Well Control and
Production Safety Training - Testing Program |
2009-G01 |
July 1, 2009 |
Casing Pressure |
2008-G25 |
Jan 1, 2009 |
Departure for Meter Provings, Meter
Calibrations, and Well Tests Due to Force Majeure Events |
2008-G24 |
Dec 31, 2008 |
Lease Term Extensions Pursuant to 30
CFR 250.180(e) Due to Hurricane Damage |
2008-G23 |
Nov 20, 2008 |
Damage from Hurricanes Gustav and Ike
(Supplement No. 2) |
2008-G22 |
Nov 19, 2008 |
Information Guidance for Availability
of Well Data and Information Through the Gulf of Mexico Region Online
Ordering System |
2008-G21 |
Oct 17, 2008 |
Damage Caused by Hurricanes Gustav and Ike (Supplement) |
2008-G20 |
Oct 20, 2008 |
Revisions to the List of OCS Lease Blocks Requiring Archaeological
Resource Surveys and Reports |
2008-N09 |
Oct 29, 2008 |
Extension of Lease and Unit Terms by Production in Paying Quantities |
2008-G19 |
Oct 2, 2008 |
Changes to the Designation of Operator of an OCS Oil and Gas or
Sulphur Lease |
2008-G18  |
Sept 25, 2008 |
Damage Caused by Hurricanes Gustav and Ike |
2008-G17  |
Sept 16, 2008 |
Incident and Oil Spill Reports |
2008-G16  |
Sept 11, 2008 |
Damage Caused by Hurricane Gustav |
2008-G15  |
Sept 12, 2008 |
Departure for Meter Provings, Meter Calibrations, and Well Tests Due
to Force Majeure Events |
2008-G12  |
June 1, 2008 |
Drilling Windows, Eastern Gulf of Mexico |
2008-G11  |
May 21, 2008 |
Interim Guidelines for Tie-downs on OCS Production Platforms for the
2008 Hurricane Season |
2008-G10  |
June 1, 2008 |
Guidelines for Jack-up Drilling Rig Fitness Requirements for
Hurricane Season |
2008-G09  |
June 1, 2008 |
Guidelines for Moored Drilling Rig Fitness Requirements for
Hurricane Season |
2008-G08  |
May 19, 2008 |
Hurricane and Tropical Storm Effects Reports |
2008-G07  |
June 15, 2008 |
Managed Pressure Drilling Projects |
2008-G06  |
May 26, 2008 |
Remotely Operated Vehicle Surveys in Deepwater |
2008-G05  |
May 1, 2008 |
Shallow Hazards Program |
2008-G04  |
May 1, 2008 |
Information Requirements for Exploration Plans and Development
Operations Coordination Documents |
2008-N03  |
March 31, 2008 |
Well Control and Production Safety Training |
2008-G03  |
April 14, 2008 |
Pollution Inspection Intervals for Unmanned Facilities |
2008-G02  |
March 31, 2008 |
Incident and Oil Spill Reports |
2008-N04  |
March 12, 2008 |
Performance Measures for OCS Operators and Form MMS-131 |
2008-G01  |
February 28, 2008 |
Suspensions of Operations Based on Rig Delays, Lack of Rig
Availability and Procurement of Long Lead Equipment |
2008-N02  |
March 1, 2008 |
Outer Continental Shelf (OCS) Inspection Program |
2007-G27  |
October 1, 2007 |
Assessment of Existing OCS Platforms and Related Structures for
Hurricane Conditions |
2007-G26  |
December 28, 2007 |
Design of New OCS Platforms and Related Structures for Hurricane
Conditions |
2007-N04  |
September 28, 2007 |
Oil Discharge Written Follow-up Reports |
2007-G25  |
September 24, 2007 |
2008 Gulfwide OCS Emissions Inventory (Western Gulf of Mexico) |
2007-G24  |
September 24, 2007 |
Changes to the Designation of Operators of an OCS Oil and Gas or
Sulfur Lease |
2007-G23  |
August 31, 2007 |
Cancellation of NTL No. 2007-G10 |
2007-N03  |
September 28, 2007 |
Outage of Pay.Gov for electronic fee payments |
2007-G22  |
June 25, 2007 |
Suspensions of Operations for Subsalt and Ultradeep Geophysical Work |
2007-G21  |
June 1, 2007 |
Conservation Information Documents |
2007-G20  |
May 25, 2007 |
Coastal Zone Management Program Requirements for OCS Right-of-way
Pipeline Applications |
2007-G19  |
May 25, 2007 |
Interim Guidelines for Moored Drilling Rig Fitness Requirements for
the 2007 Hurricane Season |
2007-G18  |
May 21, 2007 |
Interim Guidelines for Tie-downs on OCS Production Platforms for the
2007 Hurricane Season |
2007-G17  |
May 7, 2007 |
Deepwater Ocean Current Monitoring on Floating Facilities |
2007-G16  |
May 15, 2007 |
Hurricane & Tropical Storm Effects Reports |
2007-G15  |
May 15, 2007 |
eWell Permitting and Reporting System |
2007-G05  |
February 15, 2007 |
Well Producibility Determinations |
2007-G01  |
February 15, 2007 |
Shallow Hazards Program |
2007-G04  |
February 7, 2007 |
Vessel Strike Avoidance and Injured/Dead Protected Species Reporting |
2007-G03  |
February 7, 2007 |
Marine Trash and Debris Awareness and Elimination |
2007-G02  |
February 7, 2007 |
Implementation of Seismic Survey Mitigation Measures and Protected Species Observer Program |
2006-G16
(Addendum 1)  |
February 1, 2007 |
Well Records Submittal (Updated) Elimination of Paper Copy Data Submittals (Addendum No. 1) |
2007-N01  |
January 11, 2007 |
2007 Industry Awards Program and Luncheon |
2006-N06  |
December 19, 2006 |
Flaring and Venting Approvals |
2006-G21  |
October 26, 2006 |
Regional and Subregional Oil Spill Response Plans |
2006-G20  |
October 25, 2006 |
Mudline Suspension Wells: Dry Tree Tiebacks and Conversion to Subsea
Wells |
2006-N05  |
Sept 1, 2006 |
Payment Method for New and Existing Cost Recovery Fees |
2006-G16  |
July 15, 2006 |
Well records Submittal (Updated) Elimination of Paper Copy Data Submittals |
2006-G15  |
July 12, 2006 |
Guidance for Submitting Exploration Plans and Development Operations Coordination Documents |
2006-G14  |
July 12, 2006 |
Information Requirements for Exploration Plans and Development Operations Coordination Documents |
2006-G20 (Addendum 1)  |
June 12, 2006 |
Damage Caused by Hurricanes Katrina and Rita (Addendum No. 1) |
2006-G13  |
June 12, 2006 |
Conducting Platform Operations Before MMS Approval |
2006-G12  |
July 3, 2006 |
Ancillary Activities |
2006-G11  |
June 2, 2006 |
Hurricane and Tropical Storm Evacuation and Production Curtailment Statistics |
2NTL 99-N01 (Addendum 1)  |
June 1, 2006 |
Guidelines for Oil Spill Financial Responsibility for Covered Facilities |
2006-N04  |
May 22, 2006 |
New Payment Method for Existing Cost Recovery Fees |
2006-G10  |
May 19, 2006 |
Interim Guidelines for Moored Drilling Rig Fitness Requirements for the 2006 Hurricane Season |
2006-G09  |
May 1, 2006 |
Interim Guidelines for Jack-up Drilling Rig Fitness Requirements for the 2006 Hurricane Season |
2006-G08  |
March 24, 2006 |
Amended - Gulf of Mexico Regional Office Operations |
2006-G07  |
March 16, 2006 |
Revisions to the List of OCS
Lease Blocks Requiring Archaeological Resource Surveys and Reports |
2006-G06  |
March 16, 2006 |
Resumption of Submission of
Well Records to A2D's New Orleans Office |
2006-N02  |
March 8, 2006 |
Payment Method for New and
Certain Existing Cost Recovery Fees |
2006-G05  |
March 1, 2006 |
Drilling Window, Eastern
Gulf of Mexico |
2006-N03  |
March 1, 2006 |
Reminder to Submit
Performance Measures Data by March 31, 2006 |
2006-G04  |
Feb 22, 2006 |
Fire Prevention and Control
Systems |
2006-G03  |
Feb 10, 2006 |
Lease Term Extensions
Pursuant to 30 CFR 250.180(e) Because of Hurricane Damage |
2006-G02  |
Feb 10, 2006 |
Suspensions of Operations
Based on Rig Delays, Lack of Rig Availability and Procurement of Long
Lead Equipment |
2006-G01  |
Feb 1, 2006 |
Royalty Relief for Gulf of
Mexico OCS Oil and Gas Leases with Facilities Damaged by Hurricane
Katrina or Hurricane Rita |
2006-N01  |
Jan 6, 2006 |
2006 Industry Awards Program
and Luncheon |
2005-N03  |
Jan 3, 2006 |
Payment Method for New and
Certain Existing Cost Recovery |
2005-G20  |
Oct 24, 2005 |
Damage Caused by Hurricanes
Katrina and Rita |
2005-G15  |
Sept 21, 2005 |
Hurricane and Tropical Storm
Evacuation and Production Curtailment Statistics |
2005-G10  |
July 1, 2005 |
Revisions to the List of OCS
Lease Blocks Requiring Archaeological Resource Surveys & Reports |
|
2005-G09 |
June 1, 2005 |
Static Casing Pressures Less
than 100 psig |
|
2005-G08 |
May 31, 2005 |
Contact with District
Offices and the Pipeline Section Outside Regular Work Hours |
|
2005-G07 |
July 1, 2005 |
Archaeological Resource
Surveys and Reports |
|
2005-G06 |
May 26, 2005 |
Hurricane
and Tropical Storm Evacuation and Production Curtailment Statistics |
|
2005-G05 |
April 30, 2005 |
Deepwater Ocean Current
Monitoring on Floating Facilities |
|
2005-N02 |
March 2, 2005 |
Performance Measures for OCS
Operators and Form MMS-131 |
|
2005-G04 |
March 1, 2005 |
Flaring and Venting
Regulations |
|
2005-G03 |
January 25, 2005 |
Lease Extension Because of
Hurricane Ivan |
|
2005-N01 |
January 7, 2005 |
2005 Industry Awards Program
and Luncheon |
|
2005-G02 |
January 6, 2005 |
Deepwater Ocean Current
Monitoring on Floating Facilities |
|
2005-G01 |
January 6, 2005 |
Monitoring Bypassed Safety
Devices |
|
2004-G22 |
December 1, 2004 |
Drilling Windows, Eastern
Gulf of Mexico |
|
2004-G20 |
November 15, 2004 |
Damage Caused by Hurricane
Ivan (Part 3) |
|
2004-G19 |
October 18, 2004 |
Damage Caused by Hurricane
Ivan (Part 2) |
|
2004-G18 |
October 4, 2004 |
Damage Caused by Hurricane
Ivan |
| 2004-G17 |
September 10, 2004 |
Production
Activities Information Collection and Reporting for Calculations of Air Emissions in the
Western Gulf of Mexico |
| 2004-G16 |
August 19, 2004 |
Suspensions
of Operations (SOO's) for Drilling Ultra-Deep Wells Under Salt Sheets |
| 2004-G15 |
August 10, 2004 |
Application
of the Deep Gas Royalty Relief Rule to Leases Issued from 2001 through 2003 |
| 2004-N04 |
June 25, 2004 |
Data
and Information to be Made Available to the Public |
| 2004-G14 |
June 23, 2004 |
Hurricane
and Tropical Storm Evacuation and Production Curtailment Statistics |
|
2004-G13 |
June 22, 2004 |
Replacing
Deep Gas Royalty Relief Provisions in Lease Instrument With Regulatory Deep Gas Royalty
Relief Provisions |
|
2004-G12 |
June 21, 2004 |
Clarification
of Deep Gas Royalty Suspension Provision in Lease Instrument Relating to Sidetrack
Completions |
|
2004-G11 |
May 3, 2004 |
Clarification
of Deep Gas Royalty Relief Regulation Regarding Natural Gas Liquids and Pipeline
(Retrograde) Condensate |
| 2004-N03 |
July 26, 2004 |
Directional
and Inclination Survey Data Submission Requirements |
| 2004-G07 Addendum1 |
June 1, 2004 |
Change
of MMS Contractor Receiving Digital Well Log Drilling Records and Additional Well Log
Curves to Submit |
| 2004-G10 |
May 26, 2004 |
Implementation
of the eWell Permitting and Reporting System |
| 2004-G09 |
May 17, 2004 |
Policies
for Shutting-In Producible Wells During Rig Moves |
| 2004-N03 |
July 26, 2004 |
Directional
and Inclination Survey Data Submission Requirements |
| 2004-G08 |
April 21, 2004 |
Flaring
and Venting Approval Guidelines |
2004-G07  |
April 20, 2004 |
Well
Records Submittal |
| 2004-G06 |
April 5, 2004 |
Structure
Removal Operations |
2004-G05  |
April 1, 2004 |
Biologically
Sensitive Areas of the Gulf of Mexico |
| 2004-G04 |
March 7, 2004 |
Standard
Reporting Period for the Well Activity Report |
| 2004-G01 |
March 1, 2004 |
Implementation
of Seismic Survey Mitigation Measures and Protected Species Observer Program |
| 2004-G03 |
February 6, 2004 |
Notification
and Confirmation of Deep Gas Royalty Relief |
| 2004-N02 |
February 2, 2004 |
2004
Industry Awards Program and Luncheon |
| 2004-G02 |
January 27, 2004 |
Military
Warning and Water Test Areas |
| 2004-N01 |
January 12, 2004 |
Revised
Assessment Matrix |
| 2003-G20 |
January 1, 2004 |
Gas
Volume Statement Requirements |
| 2003-N05 |
December 17, 2003 |
eWell
Permit and Reporting System Presentation |
| 2003-G19 |
September 9, 2003 |
Drilling
Windows, Eastern Gulf of Mexico |
| 2003-G18 |
September 4, 2003 |
Two-Day
Workshop on the Assessment of Fixed Offshore Structures |
| 2003-G17 |
August 27, 2003 |
Guidance
for Submitting Exploration Plans and Development Operations Coordination Documents |
| 2003-G14 |
August 8, 2003 |
Gas
Volume Statement Requirements |
| 2003-G13 |
July 28, 2003 |
Flaring
& Venting Approval Guidelines |
| 2003-G12 |
July 23, 2003 |
Hurricane
and Tropical Storm Evacuation and Production Curtailment Statistics |
| 2003-G11 |
June 19, 2003 |
Marine
Trash and Debris Awareness and Elimination |
| 2003-G10 |
June 19, 2003 |
Vessel
Strike Avoidance and Injured/Dead Protected Species Reporting |
| 2003-N06 |
June 17, 2003 |
Supplement
Bond Procedures |
| 2003-G09 |
June 10, 2003 |
Seminar
on Significant Damage to Platforms |
| 2003-G08 |
June 5, 2003 |
Implementation
of Seismic Survey Mitigation Measures and Protected Species Observer Program |
|
2003-N04 |
May 9, 2003 |
Extension
of Lease Terms by Production in Paying Quantities |
| 2003-N03 |
March 7, 2003 |
Performance
Measures for OCS Operators and Form MMS-131 |
| 2003-G07 |
February 15, 2003 |
Vessel
Strike Avoidance and Injured/Dead Protected Species Reporting |
| 2003-G06 |
February 15, 2003 |
Marine
Trash and Debris Awareness and Elimination |
| 2003-G05 |
February 15, 2003 |
Procedures
for Submission, Inspection and Selection of Geophysical Data and Information Collected
Under a Permit and Processed or Reprocessed by a Permittee or a Third Party |
|
2003-G02 |
March 3, 2003 |
Ultimate
Recovery Abandonment and Bypassing of Zones |
| 2003-N02 |
February 5, 2003 |
Reminder
Concerning Periodic Inspection of Unmanned Fixed OCS Platforms |
|
2003-G04 |
January 28, 2003 |
Damages
Caused by Hurricane Lili |
| 2003-N01 |
January 24, 2003 |
2003
Industry Awards Program and Luncheon |
| 2003-G03 |
January 23, 2003 |
Remotely
Operated Vehicle Surveys in Deepwater |
|
2003-G01 |
January 14, 2003 |
Damage
Caused by Hurricane Lili |
|
2002-G15 |
December 20, 2002 |
Coastal
Zone Management Program Requirements for OCS ROW Pipeline Applications |
|
2002-N13 |
November 1, 2002 |
Drilling
and Well Permit and Reporting Forms |
|
2002-G14 |
November 15, 2002 |
Vessel
Strike Avoidance and Injured/Dead Protected Species Reporting |
|
2002-G13 |
November 15, 2002 |
Marine
Trash and Debris Awareness and Elimination |
|
2002-G12 |
November 4, 2002 |
Revised
North American Datum 83 Implementation Plan for the Gulf of Mexico |
|
2002-N12 |
November 1, 2002 |
OMM
eGov Transformation Presentations |
|
2002-N11 |
October 16, 2002 |
Rescheduled
Houston MMS Well Applications and Reporting Forms Workshop |
|
2002-G07 Addendum 1 |
October 15, 2002 |
Implementation
of Seismic Survey Mitigation Measures |
|
2002-G09 |
October 1, 2002 |
Regional
and Subregional Oil Spill Response Plans |
|
2002-G11 |
September 20, 2002 |
Hurricane
and Tropical Storm Evacuation and Production Curtailment Statistics |
|
2002-N10 |
September 4, 2002 |
Surface
Blowout Preventer Workshop for Floating Drilling Operations |
|
2002-G10 |
September 4, 2002 |
Standard
Conditions of Approval for Well Activities |
|
2002-G08 |
August 29, 2002 |
Information
Requirements for Exploration Plans and Development Operations Coordination Documents |
|
2002-N09 |
August 23, 2002 |
MMS
Well Applications and Reporting Forms Workshop |
|
2002-G07 |
August 22, 2002 |
Implementation
of Seismic Survey Mitigation Measures |
NTL-98-18
(Addendum 1) |
August 14, 2002 |
Change
of Name and Address of the MMS Agent Receiving Well Log Drilling Records |
|
2002-N08 |
July 26, 2002 |
Deepwater
Blowout Intervention Workshop |
|
2002-N07 |
July 19, 2002 |
Reminder
of the 20 Percent Set-Aside Provision for Small or Independent Refiners |
|
2002-N06 |
July 11, 2002 |
Guidelines
for Crane Load Tests and Recordkeeping on Fixed OCS Facilities |
|
2002-G06 |
July 1, 2002 |
Drilling
Windows, Eastern Gulf of Mexico |
|
2002-G05 |
June 11, 2002 |
Open Hole Log and
Survey Information for the Weekly Activity Report |
|
2002-N05 |
May 20, 2002 |
International
Workshop: Fire & Blast Considerations in the Future
Design of Offshore Facilities |
|
2002-G04 |
April 22, 2002 |
Gas Volume
Statement Requirements |
|
2002-G03 |
March 20, 2002 |
Supervisory
Control and Data Acquisition (SCADA) Systems |
|
2002-G01 |
March 15, 2002 |
Archaeological
Resource Surveys and Reports |
|
2002-G02 |
March 1, 2002 |
Notification and
Confirmation of Deepwater Royalty Relief for Eligible Leases |
|
2002-N02 |
February 14, 2002 |
Revised Guidelines
for Royalty Relief Under 30 CFR Part 203 |
|
2002-N04 |
February 5, 2002 |
2002 Industry
Awards Program and Luncheon |
|
2002-N03 |
January 29, 2002 |
2nd Inernational
Workshop on Human Factors in Offshore Operations |
|
2002-N01 |
January 10, 2002 |
Performance
Measures for OCS Operators and Form MMS-131 |
|
2002-G01 |
March 15, 2002 |
Archaeological
Resource Surveys and Reports |
|
2001-G10 |
November 28, 2001 |
Clarification of
Eastern Gulf of Mexico Sale 181 Military Areas Stipulation |
|
2001-G09 |
November 21, 2001 |
Fire Prevention
and Control Systems |
|
2001-N03 |
November 5, 2001 |
30 CFR 250,
Subpart O - Well Control and Production Safety Training |
|
2001-G08 |
October 9, 2001 |
Structure Removal
Applications |
|
2001-N02 |
September 6, 2001 |
Submitting
Semiannual Well Test Results Electronically |
|
2001-G07 |
August 7, 2001 |
Rate Control
Section Address and Telephone Procedures |
|
2001-G06 |
July 26, 2001 |
Fire Prevention
and Control Systems (Replaced with NTL 2001-G09) |
|
2001-G05 |
June 20, 2001 |
Fire Prevention
and Control Systems (Replaced with NTL 2001-G06) |
|
2001-G04 |
June 1, 2001 |
Remotely Operated
Vehicle Surveys in Deepwater |
|
2001-G03 |
April 15, 2001 |
Gas Volume
Statement Requirements |
|
2001-G02 |
March 1, 2001 |
Drilling Windows,
Eastern Gulf of Mexico |
|
2001-G01 |
February 20, 2001 |
Production
Activities Information Collection and Reporting (Western Gulf of Mexico) |
|
2001-N01 |
January 31, 2001 |
2000 Industry
Awards Program and Luncheon |
|
2000-G22 |
December 22, 2000 |
Subsalt Lease Term
Extension |
|
2000-G21 |
December 26, 2000 |
Information
Requirements for Exploration Plans and Development Operations Coordination Documents |
|
2000-G20 |
December 6, 2000 |
Deepwater
Chemosynthetic Communities |
|
2000-G19 |
November 21, 2000 |
Production
Activities Information Collection and Reporting (Breton National Wildlife
Refuge/Wilderness Area) |
|
2000-G18 |
November 21, 2000 |
Meteorological
Data collection and Reporting (Breton National Wildlife Refuge/Wilderness Area) |
|
2000-G17 |
September 1, 2000 |
Suspension of
Production/Operations Overview |
|
2000-G16 |
September 7, 2000 |
Guidelines for
General Lease Surety Bonds |
|
2000-G15 |
September 6, 2000 |
Hurricane and
Tropical Storm Evacuation and Production Curtailment Statistics |
|
2000-G14 |
August 29, 2000 |
Contact with
District Offices and the Pipeline Section Outside Regular Work Hours |
|
2000-G13 |
May 25, 2000 |
Production Safety
Systems Requirements |
|
2000-G11 |
May 12, 2000 |
Pollution
Inspection Intervals for Unmanned Facilities |
|
2000-N07 |
November 9, 2000 |
Well Naming and
Numbering Standards |
|
2000-G07 |
February 22, 2000 |
Accidental
Disconnect of Marine Drilling Risers |
|
2000-N06 |
October 1, 2000 |
Deepwater
Operations Plans (DWOP) |
|
2000-G06 |
February 4, 2000 |
Supervisory
Control and Data Acquisition (SCADA) Systems |
|
2000-N05 |
October 1, 2000 |
Conservation
Information |
|
2000-N04 |
September 15, 2000 |
Guidelines for
Crane and Rigging Operations on Fixed Offshore OCS Facilities |
|
2000-G04 |
January 28, 2000 |
Well Producibility
Determinations |
|
2000-N03 |
October 13, 2000 |
Clarification of
30 CFR 250, Subpart O - Well Control and Production Safety Training |
|
2000-G03 |
January 28, 2000 |
Functional
Responsibility of MMS Regulations |
|
2000-G02 |
January 25, 2000 |
Deepwater
Experimental Oil Release Study |
|
NTL 99-G22 |
September 24, 1999 |
Guidelines for the
Sub-Seabed Disposal and Offshore Storage of Solid Wastes |
|
NTL 99-G21 |
September 13, 1999 |
Platform Removal
Application |
|
NTL 99-G20 |
September 7, 1999 |
Downhole
Commingling Applications |
|
NTL 99-G19 |
September 7, 1999 |
Downhole
Commingling Policies |
|
NTL 99-G17 |
July 8, 1999 |
North American
Datum 83 Implementation Plan for the Gulf of Mexico |
|
NTL 99-G16 |
July 8, 1999 |
Live Bottom
Surveys and Reports |
|
NTL 99-G12 |
June 7, 1999 |
Increased Level II
Underwater Structural Inspection Intervals |
|
NTL 99-G11 |
June 7, 1999 |
Approval of
Acidizing Operations |
|
NTL 99-G10 |
May 11, 1999 |
Designated Safe
Welding and Burning Areas on Rigs |
|
NTL 99-G09 |
May 10, 1999 |
Location of Choke
and Kill Lines on BOP Stacks |
|
NTL 99-G08 |
May 10, 1999 |
Removing
Underwater Casing Stubs |
|
NTL 99-G07 |
May 3, 1999 |
U.S. Air Force
Communication Towers |
|
NTL 99-G06 |
May 1, 1999 |
Economic
Assumptions for RSVP Deepwater Royalty Relief Model |
|
NTL 99-G05 |
April 26, 1999 |
Submittal of
Documents for Platforms and Structures |
|
NTL 99-N04 |
March 5, 1999 |
Revised Guidelines
for Royalty Relief Under 30 CFR Part 203 |
|
NTL 99-N03 |
March 1, 1999 |
Performance
Measures for OCS Operators and Form MMS-131 |
|
NTL 99-N01 |
January 6, 1999 |
Guidelines for Oil
Spill Financial Responsibility for Covered Facilities |
|
NTL 99-G01 |
February 12, 1999 |
Deepwater
Emergency Well Control Operations |
|
NTL 98-30 |
March 1, 1999 |
Regional Oil Spill
Response Plans |
|
NTL 98-29 |
December 18, 1998 |
Announcement of
Project to Clean Up Historical Well Data |
NTL 98-29
(Addendum 1) |
March 15, 1999 |
Well Records for
Information corrected or Completed During the Project to Clean Up Historical Well Data
Exemption from Incidents of Non-compliance |
NTL 98-29
(Addendum 2) |
February 16, 2000 |
Wells
(holes-in-the-ground) Without Assigned MMS API Numbers |
|
NTL 98-27 |
December 1, 1998 |
Guidelines for
Eliminating Trash and Debris Resulting from Gulf of Mexico OCS Operations |
|
NTL 98-26 |
November 30, 1998 |
Minimum Interim
Requirements for Site Clearance (and Verification) of Abandoned Oil and Gas Structures in
the Gulf of Mexico |
|
NTL 98-24 |
October 15, 1998 |
Rate Control
Section Address, Office Hours, and Telephone Procedures |
|
NTL 98-23 |
October 15, 1998 |
Interim Reporting
Requirements for 30 CFR 250, Subpart K,
Oil and Gas Production Rates |
|
NTL 98-20 |
September 15, 1998 |
Shallow Hazards
Requirements |
|
NTL 98-19 |
September 15, 1998 |
Temporary
Abandonment of Wells and Maintenance, Protection, and Removal of Underwater Casing Stubs |
NTL 98-18N
(Addendum 1) |
September 12, 2000 |
Additional
Guidance for Third-Party Guarantees |
|
NTL 98-18N |
December 28, 1998 |
Supplemental Bond
Procedures |
|
NTL 98-18 |
September 1, 1998 |
Change of Address
for the Submittal of Certain Drilling Well Records in Accordance with 30 CFR 250.416 |
|
NTL 98-16 |
August 10, 1998 |
Hydrogen Sulfide
(H2S) Requirements |
|
NTL 98-13N |
July 1, 1998 |
Use of New or
Alternative Technology and Procedures |
|
NTL 98-13 |
August 10, 1998 |
Minimizing Oil and
Gas Structures in the Gulf of Mexico |
|
NTL 98-12N |
July 1, 1998 |
Determination of
Pollution Inspection Frequencies
for Unmanned Facilities |
|
NTL 98-12 |
August 10, 1998 |
Implementation of
Consistent Biological Stipulation Measures in the Central and Western Gulf of Mexico |
|
NTL 98-10 |
August 10, 1998 |
Best Available
Control Technology (Sulphur Dioxide) |
|
NTL 98-09 |
August 10, 1998 |
Proposed and
As-Build Pipeline Location Data |
|
NTL 98-06 |
August 10, 1998 |
Archaeological
Requirements |
|
NTL 98-5N |
April 1, 1998 |
Application and
Audit Fees for Requests for Royalty Relief or Adjustment Under 30 CFR Part 203 |
|
NTL 98-05 |
July 1, 1998 |
Confirmation of
Deepwater Royalty Relief for Leases Issued After November 28, 1995 |
|
NTL 98-4N |
March 3, 1998 |
Interim Guidance
for Applying "Simplified Fatigue Analysis" Procedure from American Petroleum
Institute (API) Recommended Practice 2A (RP 2A), "Planning, Designing, and
Constructing Fixed Offshore Platforms," Nineteenth Edition (August 1, 1991) and
Twentieth Edition (July 1, 1993) and its Supplement 1 (February 1, 1997) |
|
NTL 98-1N |
January 2, 1998 |
Interim Guidance
for Applying Platform Design Criteria from American Petroleum
Institute (API) Recommended Practice 2A(RP 2A), "Planning, Designing, and
Constructing Fixed Offshore Platforms," Nineteenth Edition (August 1, 1991) and
Twentieth Edition (July 1, 1993) and its Supplement 1 (February 1, 1997) |
|
NTL 97-18 |
August 18, 1997 |
Timely Submittal
of Deepwater Royalty Relief Applications |
|
NTL 97-17 |
August 1, 1997 |
Containment
Requirements for Bolted or Welded Stock Tanks |
|
NTL 97-16 |
August 1, 1997 |
Production Within
500 Feet of a Unit or Lease Line |
|
NTL 97-07 |
March 1, 1997 |
Revised Conditions
of Approval to Drill, Sidetrack and/or Complete for Oil and Gas Production |
|
NTL 97-06 |
March 1, 1997 |
Timely Submittal
of Drilling Well Records in Accordance with 30 CFR 250.66 |
|
NTL 97-5N |
October 7, 1997 |
Outer Continental
Shelf (OCS) Civil Penalties Program
Revised Assessment Matrix |
|
NTL 97-4N |
September 1, 1997 |
Outer Continental
Shelf (OCS) Civil Penalties Program Annual Summary to be Published |
|
NTL 97-3N |
August 1, 1997 |
Outer Continental
Shelf (OCS) Program |
|
NTL 97-2N |
August 1, 1997 |
Well Naming and
Numbering Standards |
|
NTL 96-7N |
December 10, 1996 |
Outer Continental
Shelf (OCS) Civil Penalties Program |
|
NTL 96-10 |
December 5, 1996 |
Air Emissions
Information for Applications for Accessory Platforms to Pipeline Rights-of-way |
|
NTL 96-08 |
November 25, 1996 |
Time Allowed for
the Correction of Incidents of Noncompliance (INC's) and for the Return of Notification of
INC Forms |